INCOTEC CARGO proceeds with shipments of JSC “Atomstroyexport” equipment for the Second Construction Stage of NPP “Kudankulam”, India.
Currently, the 4th consignment is being shipped for Units №3 and №4 of NPP “Kudankulam”, India.
Thus, as of the end of July 2016 it has been shipped 740 tons, 1100 m3 of power-generating equipment by means of 20/40 ft containers. The total quantity of shipped containers is 78.
The next consignment with its total weight of 150 tons and volume of 300 m3 is expected to be delivered to the Port of Saint Petersburg at the beginning of August.
Since 2002 INCOTEC CARGO has been implementing shipments of complete power-generating equipment of JSC “Atomstroyexport” for first (Units №1 and №2) and second (Units №3 and №4) construction stages of NPP “Kudankulam”. During this period it has been shipped more than 700 containers and 49 shipload lots with their volume of 106500 MT/357000 freight tons including 12 heavyweight units (unit weight from 318 to 370 tons) and oversized equipment produced by JSC “Izhorskiye Zavody” and JSC “ZiO-Podolsk”.