INCOTEC CARGO has completed multimodal transportation of pipes with their length up to 14 meters to Moscow Region from Spain.
In March 2013 INCOTEC CARGO has completed equipment transportation for Yugo-Zapadnaya TPP from Moscow to Saint-Petersburg. The shipment consisted of 6 heavyweight and oversized blocks with their length of 16 meters and weight 60 tons each. By 1st April 2013 the whole consignment has been delivered to the Consignee.
2012 – Door-to-Door delivery of 3 High Pressure Drums (the heaviest weighted 67 tons) from Czech Republic. Logistics included inland trucking through the Europe, terminal handling, sea freight, customs clearance upon arrival to the port of Saint Petersburg and railway transportation to MOSENERGO and Novogorkovskaya Thermal Power Plant in Kstovo. Customer: Podolsk Machine Building Plant JSC |
- 2011 – Multimodal – inland trucking and water delivery of Reactor Vessel with its weight of 340 tons to the job site of Novovoronezh Nuclear Power Plant – 2
- 2010- 2012 - Direct inland trucking and railway delivery as well as multimodal transportation of petrochemical heavyweight and oversized equipment with its total volume of 5 600 freight tons for Oil Refinery in Pancevo (Serbia). Customer: JSC Uralhimmash
- 2010 to date – equipment transportation for Oil Refining and Petrochemical Complex OJSC TANECO (Nizhnekamsk).
- 2010 г. – Simultaneous transportation of 2 hydrocracking reactors (weight 1250 tons each, length 37,5 meters, width 7,7 meters, height 6,5 meters) for Oil Refining and Petrochemical Complex TANECO in Nizhnekamsk . Customer: Izhorskiye Zavody by order of OMZ (Uralmash – Izhora Group)