2011 – Multimodal – inland trucking and water delivery of Reactor Vessel with its weight of 340 tons to the job site of Novovoronezh Nuclear Power Plant – 2. In total, a barge went a distance of more than 3 800 kilometers via the Neva River, Lake Ladoga, Lake Onega, Volga–Baltic Canal, the Volga River and the Don River. Discharge of Reactor (length more than 11 meters, width and height 5 meters) has been implemented by means of lifting frame. Self-Propelled Modular Transporters designed for heavyweight cargo were used for inland transportation to the job site. Customer: Izhorskiye Zavody JSC.