2011 – Multimodal – inland trucking and water delivery of Reactor Vessel with its weight of 340 tons to the job site of Novovoronezh Nuclear Power Plant – 2. In total, a barge went a distance of more than 3 800 kilometers via the Neva River, Lake Ladoga, Lake Onega, Volga–Baltic Canal, the Volga River and the Don River. Discharge of Reactor (length more than 11 meters, width and height 5 meters) has been implemented by means of lifting frame. Self-Propelled Modular Transporters designed for heavyweight cargo were used for inland transportation to the job site. Customer: Izhorskiye Zavody JSC.

 

 

2010 - 2012 - Direct inland trucking and railway delivery as well as multimodal transportation of petrochemical heavyweight and oversized equipment with its total volume of 5 600 freight tons for Oil Refinery in Pancevo (Serbia). Customer:  JSC Uralhimmash

 

 

2010 to date – equipment transportation for  Oil Refining and Petrochemical Complex  OJSC TANECO (Nizhnekamsk).

 

 

2010 г. – Simultaneous transportation of 2 hydrocracking reactors (weight 1250 tons each, length 37,5 meters, width 7,7 meters, height 6,5 meters) for  Oil Refining and Petrochemical Complex TANECO in Nizhnekamsk . Customer: Izhorskiye Zavody by order of OMZ (Uralmash – Izhora Group)

 

 

2010 - Direct railway and trucking transportation as well as multimodal transportation of power equipment (18 waste-heat boilers weight 72 tons each and 23 units of oversized equipment - 3500 freight tons in total) for Thermal Power Plant Sisak, Croatia. Customer: Machine-Building Plant ZiO-Podolsk

 

 

 

2009 - Мultimodal transportation of Melt Isolator (total weight 800 tons) for the Leningrad Nuclear Power Plant-2. Barge discharge has been carried out by RO-RO method in conditions of open sea. Customer: Baltiysky Zavod JSC

 